Ballast Waterby Micro Utilities Marine

Vessel Retrofit

Make the system fit the vessel.

Written for owners, technical managers and marine engineers. An existing vessel is a constraint set, not a blank engine room.

Retrofit starts with the vessel that already exists: ballast flow, available footprint, pipe routing, electrical supply, pump characteristics, pressure loss, control integration, access, class, dry-dock timing, installation methodology and commissioning.

Constraint points on a working machinery space — not a catalogue drawing.

Ballast flow

Pump capacity versus required treatment rated capacity.

Retrofit process

  1. 01

    Vessel data collection

  2. 02

    Existing system assessment

  3. 03

    Flow and hydraulic review

  4. 04

    Space and layout assessment

  5. 05

    System selection

  6. 06

    Concept engineering

  7. 07

    Class / approval coordination as applicable

  8. 08

    Procurement

  9. 09

    Installation planning

  10. 10

    Yard integration

  11. 11

    Commissioning

  12. 12

    Handover and service

Upload vessel information

GA drawings, ballast system P&IDs, pump specifications, electrical single-line information, existing BWMS information, class documentation, photographs and equipment-room layouts. Uploads are stored privately with access control. They are not published and are not used for public AI training.

Start a Retrofit Assessment

Send the vessel particulars you have. Incomplete information is still useful.

Assess Your Vessel